Installation For Ultrafine Foller Mill


  • Zaloguj się, aby dodać odpowiedź
Brak odpowiedzi do tego tematu

#1 nnjj2015

nnjj2015

    Bywalec

  • Użytkownicy zarejestrowani
  • PipPipPip
  • 75 postów

Napisano 03 czerwiec 2020 - 07:15:28

The maintenance of the Raymond mill is a very important and regular work. It should be closely coordinated with the operation and maintenance of the machine.

1. The equipment shall be installed on a horizontal concrete foundation and fixed with anchor bolts.

2. During installation, attention should be paid to the vertical between the main body and the horizontal body.

3. After installation, check whether the bolts in all parts are loose and whether the main engine warehouse door is tightened. If so, please tighten it.

4. Power line and control switch are configured according to the power of the equipment.

5. After the inspection, carry out empty load test. If the test is normal, the production can be carried out.

 

 